{"id":2857,"date":"2016-07-20T18:00:00","date_gmt":"2016-07-20T17:00:00","guid":{"rendered":"http:\/\/www.marshflattsfarm.org.uk\/wordpress\/?p=2857"},"modified":"2016-07-20T22:26:44","modified_gmt":"2016-07-20T21:26:44","slug":"week-40-day-3","status":"publish","type":"post","link":"https:\/\/www.marshflattsfarm.org.uk\/wordpress\/?p=2857","title":{"rendered":"Week 40, Day 3"},"content":{"rendered":"<p>Week 40, Day 3:<\/p>\n<ul>\n<li>More second-fix electrical &#8211; notably connecting the supply cable to the meter (which is in a GRP cabinet outside the house) and replacing some of the switchgear used for the temporary outdoor socket.<\/li>\n<li>A bit of progress on the second-fix plumbing, installing one of the bathroom washbasins and preparing the others<\/li>\n<li>Preparing for the porcelain floor tiles in the bathrooms with a coat of PVA on the chipboard sub-floor followed by &#8220;No More Ply&#8221; boards glued and screwed into place.<\/li>\n<li>Further great work by the plastering team from GC Interfinish &#8211; working on the kitchen (ready for the kitchen units which will be arriving shortly) and the rest of the Open Plan area on the Ground Floor.<\/li>\n<\/ul>\n<div id=\"attachment_2858\" style=\"width: 1290px\" class=\"wp-caption alignnone\"><a href=\"http:\/\/www.marshflattsfarm.org.uk\/wordpress\/?attachment_id=2858\" rel=\"attachment wp-att-2858\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-2858\" class=\"size-full wp-image-2858\" src=\"http:\/\/www.marshflattsfarm.org.uk\/wordpress\/wp-content\/uploads\/2016\/07\/20160720T1500Z.jpg\" alt=\"Week 40, Day 3\" width=\"1280\" height=\"720\" srcset=\"https:\/\/www.marshflattsfarm.org.uk\/wordpress\/wp-content\/uploads\/2016\/07\/20160720T1500Z.jpg 1280w, https:\/\/www.marshflattsfarm.org.uk\/wordpress\/wp-content\/uploads\/2016\/07\/20160720T1500Z-300x169.jpg 300w, https:\/\/www.marshflattsfarm.org.uk\/wordpress\/wp-content\/uploads\/2016\/07\/20160720T1500Z-768x432.jpg 768w, https:\/\/www.marshflattsfarm.org.uk\/wordpress\/wp-content\/uploads\/2016\/07\/20160720T1500Z-1024x576.jpg 1024w, https:\/\/www.marshflattsfarm.org.uk\/wordpress\/wp-content\/uploads\/2016\/07\/20160720T1500Z-500x281.jpg 500w\" sizes=\"auto, (max-width: 1280px) 100vw, 1280px\" \/><\/a><p id=\"caption-attachment-2858\" class=\"wp-caption-text\">Week 40, Day 3<\/p><\/div>\n<div id=\"attachment_2861\" style=\"width: 1010px\" class=\"wp-caption alignright\"><a href=\"http:\/\/www.marshflattsfarm.org.uk\/wordpress\/?attachment_id=2861\" rel=\"attachment wp-att-2861\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-2861\" class=\"size-full wp-image-2861\" src=\"http:\/\/www.marshflattsfarm.org.uk\/wordpress\/wp-content\/uploads\/2016\/07\/IMG_2565.jpg\" alt=\"Twin washbasin in the second bedroom en-suite, and No More Ply on the floor ready for tiling\" width=\"1000\" height=\"750\" srcset=\"https:\/\/www.marshflattsfarm.org.uk\/wordpress\/wp-content\/uploads\/2016\/07\/IMG_2565.jpg 1000w, https:\/\/www.marshflattsfarm.org.uk\/wordpress\/wp-content\/uploads\/2016\/07\/IMG_2565-300x225.jpg 300w, https:\/\/www.marshflattsfarm.org.uk\/wordpress\/wp-content\/uploads\/2016\/07\/IMG_2565-768x576.jpg 768w, https:\/\/www.marshflattsfarm.org.uk\/wordpress\/wp-content\/uploads\/2016\/07\/IMG_2565-400x300.jpg 400w\" sizes=\"auto, (max-width: 1000px) 100vw, 1000px\" \/><\/a><p id=\"caption-attachment-2861\" class=\"wp-caption-text\">Twin washbasin in the second bedroom en-suite, and No More Ply on the floor ready for tiling<\/p><\/div>\n<div id=\"attachment_2862\" style=\"width: 1010px\" class=\"wp-caption alignright\"><a href=\"http:\/\/www.marshflattsfarm.org.uk\/wordpress\/?attachment_id=2862\" rel=\"attachment wp-att-2862\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-2862\" class=\"size-full wp-image-2862\" src=\"http:\/\/www.marshflattsfarm.org.uk\/wordpress\/wp-content\/uploads\/2016\/07\/IMG_2556.jpg\" alt=\"Base (&quot;scratch&quot;) plaster coat on one wall in the open plan area\" width=\"1000\" height=\"750\" srcset=\"https:\/\/www.marshflattsfarm.org.uk\/wordpress\/wp-content\/uploads\/2016\/07\/IMG_2556.jpg 1000w, https:\/\/www.marshflattsfarm.org.uk\/wordpress\/wp-content\/uploads\/2016\/07\/IMG_2556-300x225.jpg 300w, https:\/\/www.marshflattsfarm.org.uk\/wordpress\/wp-content\/uploads\/2016\/07\/IMG_2556-768x576.jpg 768w, https:\/\/www.marshflattsfarm.org.uk\/wordpress\/wp-content\/uploads\/2016\/07\/IMG_2556-400x300.jpg 400w\" sizes=\"auto, (max-width: 1000px) 100vw, 1000px\" \/><\/a><p id=\"caption-attachment-2862\" class=\"wp-caption-text\">Base (&#8220;scratch&#8221;) plaster coat on one wall in the open plan area<\/p><\/div>\n<div id=\"attachment_2863\" style=\"width: 1010px\" class=\"wp-caption alignright\"><a href=\"http:\/\/www.marshflattsfarm.org.uk\/wordpress\/?attachment_id=2863\" rel=\"attachment wp-att-2863\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-2863\" class=\"size-full wp-image-2863\" src=\"http:\/\/www.marshflattsfarm.org.uk\/wordpress\/wp-content\/uploads\/2016\/07\/IMG_2555.jpg\" alt=\"Finish (&quot;skim&quot;) coat over the float-and-set wet plaster in the kitchen\" width=\"1000\" height=\"750\" srcset=\"https:\/\/www.marshflattsfarm.org.uk\/wordpress\/wp-content\/uploads\/2016\/07\/IMG_2555.jpg 1000w, https:\/\/www.marshflattsfarm.org.uk\/wordpress\/wp-content\/uploads\/2016\/07\/IMG_2555-300x225.jpg 300w, https:\/\/www.marshflattsfarm.org.uk\/wordpress\/wp-content\/uploads\/2016\/07\/IMG_2555-768x576.jpg 768w, https:\/\/www.marshflattsfarm.org.uk\/wordpress\/wp-content\/uploads\/2016\/07\/IMG_2555-400x300.jpg 400w\" sizes=\"auto, (max-width: 1000px) 100vw, 1000px\" \/><\/a><p id=\"caption-attachment-2863\" class=\"wp-caption-text\">Finish (&#8220;skim&#8221;) coat over the float-and-set wet plaster in the kitchen<\/p><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Week 40, Day 3: More second-fix electrical &#8211; notably connecting the supply cable to the meter (which is in a GRP cabinet outside the house) and replacing some of the switchgear used for the temporary outdoor socket. A bit of &hellip; <a href=\"https:\/\/www.marshflattsfarm.org.uk\/wordpress\/?p=2857\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[65,59,63],"tags":[],"class_list":["post-2857","post","type-post","status-publish","format-standard","hentry","category-flooring","category-plastering","category-second-fix"],"_links":{"self":[{"href":"https:\/\/www.marshflattsfarm.org.uk\/wordpress\/index.php?rest_route=\/wp\/v2\/posts\/2857","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.marshflattsfarm.org.uk\/wordpress\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.marshflattsfarm.org.uk\/wordpress\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.marshflattsfarm.org.uk\/wordpress\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.marshflattsfarm.org.uk\/wordpress\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2857"}],"version-history":[{"count":4,"href":"https:\/\/www.marshflattsfarm.org.uk\/wordpress\/index.php?rest_route=\/wp\/v2\/posts\/2857\/revisions"}],"predecessor-version":[{"id":2865,"href":"https:\/\/www.marshflattsfarm.org.uk\/wordpress\/index.php?rest_route=\/wp\/v2\/posts\/2857\/revisions\/2865"}],"wp:attachment":[{"href":"https:\/\/www.marshflattsfarm.org.uk\/wordpress\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2857"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.marshflattsfarm.org.uk\/wordpress\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=2857"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.marshflattsfarm.org.uk\/wordpress\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=2857"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}