{"id":5970,"date":"2025-06-10T18:00:00","date_gmt":"2025-06-10T17:00:00","guid":{"rendered":"https:\/\/www.marshflattsfarm.org.uk\/wordpress\/?p=5970"},"modified":"2025-06-11T20:04:21","modified_gmt":"2025-06-11T19:04:21","slug":"outbuildings-week-14-day-2","status":"publish","type":"post","link":"https:\/\/www.marshflattsfarm.org.uk\/wordpress\/?p=5970","title":{"rendered":"Outbuildings: Week 14, Day 2"},"content":{"rendered":"\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1280\" height=\"720\" src=\"https:\/\/www.marshflattsfarm.org.uk\/wordpress\/wp-content\/uploads\/2025\/06\/20250610T1200Z.jpg\" alt=\"\" class=\"wp-image-5971\" srcset=\"https:\/\/www.marshflattsfarm.org.uk\/wordpress\/wp-content\/uploads\/2025\/06\/20250610T1200Z.jpg 1280w, https:\/\/www.marshflattsfarm.org.uk\/wordpress\/wp-content\/uploads\/2025\/06\/20250610T1200Z-300x169.jpg 300w, https:\/\/www.marshflattsfarm.org.uk\/wordpress\/wp-content\/uploads\/2025\/06\/20250610T1200Z-1024x576.jpg 1024w, https:\/\/www.marshflattsfarm.org.uk\/wordpress\/wp-content\/uploads\/2025\/06\/20250610T1200Z-768x432.jpg 768w, https:\/\/www.marshflattsfarm.org.uk\/wordpress\/wp-content\/uploads\/2025\/06\/20250610T1200Z-500x281.jpg 500w\" sizes=\"auto, (max-width: 1280px) 100vw, 1280px\" \/><figcaption class=\"wp-element-caption\">Outbuildings: Week 14, Day 2<\/figcaption><\/figure>\n\n\n\n<p>Almost all of today&#8217;s activity was off to the left of the overview photo, erecting the first set of roof trusses on the (relatively small) two-storey section and preparing to start installing the shallow brick arches over the garage door openings.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" src=\"https:\/\/www.marshflattsfarm.org.uk\/wordpress\/wp-content\/uploads\/2025\/06\/IMG_4946-1024x768.jpg\" alt=\"\" class=\"wp-image-5973\" srcset=\"https:\/\/www.marshflattsfarm.org.uk\/wordpress\/wp-content\/uploads\/2025\/06\/IMG_4946-1024x768.jpg 1024w, https:\/\/www.marshflattsfarm.org.uk\/wordpress\/wp-content\/uploads\/2025\/06\/IMG_4946-300x225.jpg 300w, https:\/\/www.marshflattsfarm.org.uk\/wordpress\/wp-content\/uploads\/2025\/06\/IMG_4946-768x576.jpg 768w, https:\/\/www.marshflattsfarm.org.uk\/wordpress\/wp-content\/uploads\/2025\/06\/IMG_4946-1536x1152.jpg 1536w, https:\/\/www.marshflattsfarm.org.uk\/wordpress\/wp-content\/uploads\/2025\/06\/IMG_4946-2048x1536.jpg 2048w, https:\/\/www.marshflattsfarm.org.uk\/wordpress\/wp-content\/uploads\/2025\/06\/IMG_4946-400x300.jpg 400w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">View looking north-west from the south-east corner of the scaffolding<\/figcaption><\/figure>\n\n\n\n<p>The steel beam over the wide internal door opening also got installed &#8211; visible on the photo above (and also in the overview shot).<\/p>\n\n\n\n<p>In addition, there was one of the monthly Site Meetings with the Architect, which includes a valuation of progress to date (and materials delivered to site) to support the monthly stage-payment on the building works.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Almost all of today&#8217;s activity was off to the left of the overview photo, erecting the first set of roof trusses on the (relatively small) two-storey section and preparing to start installing the shallow brick arches over the garage door &hellip; <a href=\"https:\/\/www.marshflattsfarm.org.uk\/wordpress\/?p=5970\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[31,23,27,94,19,45,32,28],"tags":[],"class_list":["post-5970","post","type-post","status-publish","format-standard","hentry","category-architects","category-build-progress","category-cavity-walls","category-outbuildings","category-regular-update","category-roof-insulation","category-site-meeting","category-steelwork"],"_links":{"self":[{"href":"https:\/\/www.marshflattsfarm.org.uk\/wordpress\/index.php?rest_route=\/wp\/v2\/posts\/5970","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.marshflattsfarm.org.uk\/wordpress\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.marshflattsfarm.org.uk\/wordpress\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.marshflattsfarm.org.uk\/wordpress\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.marshflattsfarm.org.uk\/wordpress\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=5970"}],"version-history":[{"count":4,"href":"https:\/\/www.marshflattsfarm.org.uk\/wordpress\/index.php?rest_route=\/wp\/v2\/posts\/5970\/revisions"}],"predecessor-version":[{"id":5984,"href":"https:\/\/www.marshflattsfarm.org.uk\/wordpress\/index.php?rest_route=\/wp\/v2\/posts\/5970\/revisions\/5984"}],"wp:attachment":[{"href":"https:\/\/www.marshflattsfarm.org.uk\/wordpress\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=5970"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.marshflattsfarm.org.uk\/wordpress\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=5970"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.marshflattsfarm.org.uk\/wordpress\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=5970"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}