{"id":5996,"date":"2025-06-16T18:00:00","date_gmt":"2025-06-16T17:00:00","guid":{"rendered":"https:\/\/www.marshflattsfarm.org.uk\/wordpress\/?p=5996"},"modified":"2025-06-16T22:03:20","modified_gmt":"2025-06-16T21:03:20","slug":"outbuildings-week-15-day-1","status":"publish","type":"post","link":"https:\/\/www.marshflattsfarm.org.uk\/wordpress\/?p=5996","title":{"rendered":"Outbuildings: Week 15, Day 1"},"content":{"rendered":"\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1280\" height=\"720\" src=\"https:\/\/www.marshflattsfarm.org.uk\/wordpress\/wp-content\/uploads\/2025\/06\/20250616T1200Z.jpg\" alt=\"\" class=\"wp-image-5997\" srcset=\"https:\/\/www.marshflattsfarm.org.uk\/wordpress\/wp-content\/uploads\/2025\/06\/20250616T1200Z.jpg 1280w, https:\/\/www.marshflattsfarm.org.uk\/wordpress\/wp-content\/uploads\/2025\/06\/20250616T1200Z-300x169.jpg 300w, https:\/\/www.marshflattsfarm.org.uk\/wordpress\/wp-content\/uploads\/2025\/06\/20250616T1200Z-1024x576.jpg 1024w, https:\/\/www.marshflattsfarm.org.uk\/wordpress\/wp-content\/uploads\/2025\/06\/20250616T1200Z-768x432.jpg 768w, https:\/\/www.marshflattsfarm.org.uk\/wordpress\/wp-content\/uploads\/2025\/06\/20250616T1200Z-500x281.jpg 500w\" sizes=\"auto, (max-width: 1280px) 100vw, 1280px\" \/><figcaption class=\"wp-element-caption\">Outbuildings: Week 15, Day 1<\/figcaption><\/figure>\n\n\n\n<p>The &#8216;attic&#8217; trusses for the &#8216;Hay Loft&#8217; were deliberately installed last week &#8211; before any of the other roof trusses &#8211; so that the walls could then be built up around them. This saved hiring a crane to lift the trusses over the completed walls, relying on the tele-handler instead. These walls are now being built. The door opening into the gable end is starting to take shape, visible in the photo below. Another &#8216;lift&#8217; of scaffolding will be required before too long.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" src=\"https:\/\/www.marshflattsfarm.org.uk\/wordpress\/wp-content\/uploads\/2025\/06\/IMG_4960-1024x768.jpg\" alt=\"\" class=\"wp-image-6000\" srcset=\"https:\/\/www.marshflattsfarm.org.uk\/wordpress\/wp-content\/uploads\/2025\/06\/IMG_4960-1024x768.jpg 1024w, https:\/\/www.marshflattsfarm.org.uk\/wordpress\/wp-content\/uploads\/2025\/06\/IMG_4960-300x225.jpg 300w, https:\/\/www.marshflattsfarm.org.uk\/wordpress\/wp-content\/uploads\/2025\/06\/IMG_4960-768x576.jpg 768w, https:\/\/www.marshflattsfarm.org.uk\/wordpress\/wp-content\/uploads\/2025\/06\/IMG_4960-1536x1152.jpg 1536w, https:\/\/www.marshflattsfarm.org.uk\/wordpress\/wp-content\/uploads\/2025\/06\/IMG_4960-2048x1536.jpg 2048w, https:\/\/www.marshflattsfarm.org.uk\/wordpress\/wp-content\/uploads\/2025\/06\/IMG_4960-400x300.jpg 400w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">&#8216;Stable&#8217; and &#8216;Hay Loft&#8217; viewed from the north-west corner<\/figcaption><\/figure>\n\n\n\n<p>The supports for the &#8216;rise and fall&#8217; brackets for the guttering have been problematic to source but there was a delivery from the (newly-selected) guttering supplier today. Lack of these supports has been holding up progress on the rest of the corbeled brickwork around the building, since it&#8217;s best if they&#8217;re built-in as the walls go up.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The &#8216;attic&#8217; trusses for the &#8216;Hay Loft&#8217; were deliberately installed last week &#8211; before any of the other roof trusses &#8211; so that the walls could then be built up around them. This saved hiring a crane to lift the &hellip; <a href=\"https:\/\/www.marshflattsfarm.org.uk\/wordpress\/?p=5996\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[23,27,24,94,19,45],"tags":[],"class_list":["post-5996","post","type-post","status-publish","format-standard","hentry","category-build-progress","category-cavity-walls","category-deliveries","category-outbuildings","category-regular-update","category-roof-insulation"],"_links":{"self":[{"href":"https:\/\/www.marshflattsfarm.org.uk\/wordpress\/index.php?rest_route=\/wp\/v2\/posts\/5996","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.marshflattsfarm.org.uk\/wordpress\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.marshflattsfarm.org.uk\/wordpress\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.marshflattsfarm.org.uk\/wordpress\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.marshflattsfarm.org.uk\/wordpress\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=5996"}],"version-history":[{"count":2,"href":"https:\/\/www.marshflattsfarm.org.uk\/wordpress\/index.php?rest_route=\/wp\/v2\/posts\/5996\/revisions"}],"predecessor-version":[{"id":6002,"href":"https:\/\/www.marshflattsfarm.org.uk\/wordpress\/index.php?rest_route=\/wp\/v2\/posts\/5996\/revisions\/6002"}],"wp:attachment":[{"href":"https:\/\/www.marshflattsfarm.org.uk\/wordpress\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=5996"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.marshflattsfarm.org.uk\/wordpress\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=5996"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.marshflattsfarm.org.uk\/wordpress\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=5996"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}