{"id":6466,"date":"2025-09-08T18:00:00","date_gmt":"2025-09-08T17:00:00","guid":{"rendered":"https:\/\/www.marshflattsfarm.org.uk\/wordpress\/?p=6466"},"modified":"2025-09-08T19:09:09","modified_gmt":"2025-09-08T18:09:09","slug":"outbuildings-week-27-day-1","status":"publish","type":"post","link":"https:\/\/www.marshflattsfarm.org.uk\/wordpress\/?p=6466","title":{"rendered":"Outbuildings: Week 27, Day 1"},"content":{"rendered":"\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1280\" height=\"720\" src=\"https:\/\/www.marshflattsfarm.org.uk\/wordpress\/wp-content\/uploads\/2025\/09\/20250908T1200Z.jpg\" alt=\"\" class=\"wp-image-6467\" srcset=\"https:\/\/www.marshflattsfarm.org.uk\/wordpress\/wp-content\/uploads\/2025\/09\/20250908T1200Z.jpg 1280w, https:\/\/www.marshflattsfarm.org.uk\/wordpress\/wp-content\/uploads\/2025\/09\/20250908T1200Z-300x169.jpg 300w, https:\/\/www.marshflattsfarm.org.uk\/wordpress\/wp-content\/uploads\/2025\/09\/20250908T1200Z-1024x576.jpg 1024w, https:\/\/www.marshflattsfarm.org.uk\/wordpress\/wp-content\/uploads\/2025\/09\/20250908T1200Z-768x432.jpg 768w, https:\/\/www.marshflattsfarm.org.uk\/wordpress\/wp-content\/uploads\/2025\/09\/20250908T1200Z-500x281.jpg 500w\" sizes=\"auto, (max-width: 1280px) 100vw, 1280px\" \/><figcaption class=\"wp-element-caption\">Outbuildings: Week 27, Day 1<\/figcaption><\/figure>\n\n\n\n<p>The most visible progress today was the removal of scaffolding from the South- and West-facing elevations of the Garage block; the scaffolding around the rest of the courtyard will be removed in the coming days.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" src=\"https:\/\/www.marshflattsfarm.org.uk\/wordpress\/wp-content\/uploads\/2025\/09\/IMG_5121-1024x768.jpg\" alt=\"\" class=\"wp-image-6469\" srcset=\"https:\/\/www.marshflattsfarm.org.uk\/wordpress\/wp-content\/uploads\/2025\/09\/IMG_5121-1024x768.jpg 1024w, https:\/\/www.marshflattsfarm.org.uk\/wordpress\/wp-content\/uploads\/2025\/09\/IMG_5121-300x225.jpg 300w, https:\/\/www.marshflattsfarm.org.uk\/wordpress\/wp-content\/uploads\/2025\/09\/IMG_5121-768x576.jpg 768w, https:\/\/www.marshflattsfarm.org.uk\/wordpress\/wp-content\/uploads\/2025\/09\/IMG_5121-1536x1152.jpg 1536w, https:\/\/www.marshflattsfarm.org.uk\/wordpress\/wp-content\/uploads\/2025\/09\/IMG_5121-2048x1536.jpg 2048w, https:\/\/www.marshflattsfarm.org.uk\/wordpress\/wp-content\/uploads\/2025\/09\/IMG_5121-400x300.jpg 400w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">The West-facing elevation of the Garage block, with the scaffolding removed &#8211; awaiting the external staircase<\/figcaption><\/figure>\n\n\n\n<p>The removal of the scaffolding clears the way for work to start on the external staircase up to the first-floor door into the &#8216;Hay Loft&#8217; (for which the design has now <em>mostly<\/em> been confirmed) &#8211; hence the clearing of the debris over the foundation pad for that &#8211; and the stacks of blocks that will form the inner skin of the walls to support the staircase.<\/p>\n\n\n\n<p>Other progress today included:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Installation of the foundation concrete for the decorative brickwork &#8216;buttress&#8217; details on the North of the Garage block<\/li>\n\n\n\n<li>Installation of the chipboard flooring inside the &#8216;Hay Loft&#8217;<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>The most visible progress today was the removal of scaffolding from the South- and West-facing elevations of the Garage block; the scaffolding around the rest of the courtyard will be removed in the coming days. The removal of the scaffolding &hellip; <a href=\"https:\/\/www.marshflattsfarm.org.uk\/wordpress\/?p=6466\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[23,65,94,19,36],"tags":[],"class_list":["post-6466","post","type-post","status-publish","format-standard","hentry","category-build-progress","category-flooring","category-outbuildings","category-regular-update","category-scaffolding"],"_links":{"self":[{"href":"https:\/\/www.marshflattsfarm.org.uk\/wordpress\/index.php?rest_route=\/wp\/v2\/posts\/6466","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.marshflattsfarm.org.uk\/wordpress\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.marshflattsfarm.org.uk\/wordpress\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.marshflattsfarm.org.uk\/wordpress\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.marshflattsfarm.org.uk\/wordpress\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=6466"}],"version-history":[{"count":2,"href":"https:\/\/www.marshflattsfarm.org.uk\/wordpress\/index.php?rest_route=\/wp\/v2\/posts\/6466\/revisions"}],"predecessor-version":[{"id":6471,"href":"https:\/\/www.marshflattsfarm.org.uk\/wordpress\/index.php?rest_route=\/wp\/v2\/posts\/6466\/revisions\/6471"}],"wp:attachment":[{"href":"https:\/\/www.marshflattsfarm.org.uk\/wordpress\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=6466"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.marshflattsfarm.org.uk\/wordpress\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=6466"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.marshflattsfarm.org.uk\/wordpress\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=6466"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}