{"id":6968,"date":"2025-11-27T18:00:00","date_gmt":"2025-11-27T18:00:00","guid":{"rendered":"https:\/\/www.marshflattsfarm.org.uk\/wordpress\/?p=6968"},"modified":"2025-11-27T19:03:49","modified_gmt":"2025-11-27T19:03:49","slug":"outbuildings-week-38-day-4","status":"publish","type":"post","link":"https:\/\/www.marshflattsfarm.org.uk\/wordpress\/?p=6968","title":{"rendered":"Outbuildings: Week 38, Day 4"},"content":{"rendered":"\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1280\" height=\"720\" src=\"https:\/\/www.marshflattsfarm.org.uk\/wordpress\/wp-content\/uploads\/2025\/11\/20251127T1200Z.jpg\" alt=\"\" class=\"wp-image-6969\" srcset=\"https:\/\/www.marshflattsfarm.org.uk\/wordpress\/wp-content\/uploads\/2025\/11\/20251127T1200Z.jpg 1280w, https:\/\/www.marshflattsfarm.org.uk\/wordpress\/wp-content\/uploads\/2025\/11\/20251127T1200Z-300x169.jpg 300w, https:\/\/www.marshflattsfarm.org.uk\/wordpress\/wp-content\/uploads\/2025\/11\/20251127T1200Z-1024x576.jpg 1024w, https:\/\/www.marshflattsfarm.org.uk\/wordpress\/wp-content\/uploads\/2025\/11\/20251127T1200Z-768x432.jpg 768w, https:\/\/www.marshflattsfarm.org.uk\/wordpress\/wp-content\/uploads\/2025\/11\/20251127T1200Z-500x281.jpg 500w\" sizes=\"auto, (max-width: 1280px) 100vw, 1280px\" \/><figcaption class=\"wp-element-caption\">Outbuildings: Week 38, Day 4<\/figcaption><\/figure>\n\n\n\n<p>The main build team are firmly in &#8216;finishing up&#8217; mode, having completed the drainage works yesterday. The rainwater attenuation pond is now completed and the area to the East of that has been re-levelled and profiled into the GrassGuard blocks bounding the block-paved parking area.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" src=\"https:\/\/www.marshflattsfarm.org.uk\/wordpress\/wp-content\/uploads\/2025\/11\/IMG_5316-1024x768.jpg\" alt=\"\" class=\"wp-image-6971\" srcset=\"https:\/\/www.marshflattsfarm.org.uk\/wordpress\/wp-content\/uploads\/2025\/11\/IMG_5316-1024x768.jpg 1024w, https:\/\/www.marshflattsfarm.org.uk\/wordpress\/wp-content\/uploads\/2025\/11\/IMG_5316-300x225.jpg 300w, https:\/\/www.marshflattsfarm.org.uk\/wordpress\/wp-content\/uploads\/2025\/11\/IMG_5316-768x576.jpg 768w, https:\/\/www.marshflattsfarm.org.uk\/wordpress\/wp-content\/uploads\/2025\/11\/IMG_5316-1536x1152.jpg 1536w, https:\/\/www.marshflattsfarm.org.uk\/wordpress\/wp-content\/uploads\/2025\/11\/IMG_5316-2048x1536.jpg 2048w, https:\/\/www.marshflattsfarm.org.uk\/wordpress\/wp-content\/uploads\/2025\/11\/IMG_5316-400x300.jpg 400w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">Completed rainwater attenuation pond, looking East towards the inlet<\/figcaption><\/figure>\n\n\n\n<p>Next up was starting the ramped driveway approach connecting the block-paved parking area to the driveway by the House, forming a foundation layer with relatively large-sized stones on top of a heavy landscape fabric, consolidated with a mechanical roller.<\/p>\n\n\n\n<p>The air-to-air heat pump has now been fully commissioned and is working to heat the Workshop and Utility Room to a &#8216;background&#8217; level of 18C. Some of the plumbing team were back on-site hooking up the connections to the Workshop sink and installing some of the pipe insulation.<\/p>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The main build team are firmly in &#8216;finishing up&#8217; mode, having completed the drainage works yesterday. The rainwater attenuation pond is now completed and the area to the East of that has been re-levelled and profiled into the GrassGuard blocks &hellip; <a href=\"https:\/\/www.marshflattsfarm.org.uk\/wordpress\/?p=6968\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[103,23,96,109,94,19,63],"tags":[],"class_list":["post-6968","post","type-post","status-publish","format-standard","hentry","category-air-to-air-heat-pump","category-build-progress","category-groundworks","category-hard-landscaping","category-outbuildings","category-regular-update","category-second-fix"],"_links":{"self":[{"href":"https:\/\/www.marshflattsfarm.org.uk\/wordpress\/index.php?rest_route=\/wp\/v2\/posts\/6968","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.marshflattsfarm.org.uk\/wordpress\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.marshflattsfarm.org.uk\/wordpress\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.marshflattsfarm.org.uk\/wordpress\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.marshflattsfarm.org.uk\/wordpress\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=6968"}],"version-history":[{"count":2,"href":"https:\/\/www.marshflattsfarm.org.uk\/wordpress\/index.php?rest_route=\/wp\/v2\/posts\/6968\/revisions"}],"predecessor-version":[{"id":6973,"href":"https:\/\/www.marshflattsfarm.org.uk\/wordpress\/index.php?rest_route=\/wp\/v2\/posts\/6968\/revisions\/6973"}],"wp:attachment":[{"href":"https:\/\/www.marshflattsfarm.org.uk\/wordpress\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=6968"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.marshflattsfarm.org.uk\/wordpress\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=6968"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.marshflattsfarm.org.uk\/wordpress\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=6968"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}