Week 22, Day 2:
- For the first time in a while there are some changes on the south side – the missing extension rafters have been added
- The Structural Insulated Panels weren’t even across the southern end of the main roof, so the fascia boards needed packing out but the finished result looks good
- The openings for the roof windows had been boarded over when the extra thickness was added to the main roof but those have been cut open again – the roof window frames need installing before the zinc roof goes on