Week 36, Day 4

Week 36, Day 4:

  • More electrical first-fix
  • More plastering, mostly on the first floor landing (which joins the second floor landing on one side)
Week 36, Day 4

Week 36, Day 4

Galvanized steel back-box for DRACO plaster wall light, with electrical connection box above

Galvanized steel back-box for DRACO plaster wall light, with electrical connection box above

DRACO plaster wall light in-situ on first floor landing

DRACO plaster wall light in-situ on first floor landing

 