Week 57, Day 5:
- Installing the armoured cables for the outside lights and sockets
- To reduce the number of holes through the air tight barrier these exit the house in one location then loop around the outside
- Installing more of the oak cappings for the glass balustrades around the staircase
![Week 57, Day 5](http://www.marshflattsfarm.org.uk/wordpress/wp-content/uploads/2016/11/20161118T1500Z.jpg)
Week 57, Day 5
![Armoured cable for outside lights](http://www.marshflattsfarm.org.uk/wordpress/wp-content/uploads/2016/11/IMG_3164.jpg)
Armoured cable for outside lights
![Oak capping for glass balustrade fixings on first-floor landing](http://www.marshflattsfarm.org.uk/wordpress/wp-content/uploads/2016/11/IMG_3176.jpg)
Oak capping for glass balustrade fixings on first-floor landing