Week 66, Day 3 Posted on 2017-02-01 by dMb Reply Week 66, Day 3: Replacing the sound insulation and the plasterboard at the western end of the Open Plan room Progressing with the first-fix wiring for the outdoor lights and sockets Week 66, Day 3 Replaced plasterboard at western end of Open Plan room
Week 57, Day 5 Posted on 2016-11-18 by dMb Reply Week 57, Day 5: Installing the armoured cables for the outside lights and sockets To reduce the number of holes through the air tight barrier these exit the house in one location then loop around the outside Installing more of the oak cappings for the glass balustrades around the staircase Week 57, Day 5 Armoured cable for outside lights Oak capping for glass balustrade fixings on first-floor landing