Week 73, Day 5

Week 73, Day 5:

  • More work on the rainwater drainage, installing pipes into the trenches dug yesterday, connecting up to the down-pipes, back-filling with pea gravel and then soil
Week 73, Day 4

Week 73, Day 5

Rainwater drainage pipes to south of house partially installed; trenches partially back-filled

Week 73, Day 4

Week 73, Day 4:

  • The build team are back on site so I’m going to re-start the daily Blog updates and call this Week 73
  • There’s not much to see from the overview shot but they’re proceeding with the rainwater drainage as shown in the second photo below
  • The other big event of the day was the switch-on of the Solar PV installation – with the EPC in-place – all very uneventful since it “just worked” and managed to generate 15 kWh on a fairly overcast day
    • The SolarEdge inverter is logging data to the SolarEdge Internet portal so I’ve got some work to do to extract performance data from there via their API
Week 78, Day 3

Week 73, Day 4

Trench for rainwater drainage at south side