Week 40, Day 5

Week 40, Day 5:

  • Completion of the floor tiling in all but the Ground Floor shower room, grouting the tiles installed yesterday
  • Clearing out the Living Room which had been used as a workshop, in readiness for plastering – and then dry-lining the wall with the back-plate for the cantilevered staircase
Week 40, Day 5

Week 40, Day 5

Grouted floor tiles in the Master Bedroom En-Suite

Grouted floor tiles in the Master Bedroom En-Suite

Grouted floor tiles in the Master Bedroom En-Suite

Grouted floor tiles in the Master Bedroom En-Suite

Dry lining over staircase back-plate in the Living Room

Dry lining over staircase back-plate in the Living Room