Week 46, Day 3

Week 46, Day 3:

  • Installing the inspection chambers (bedded in concrete) and the drainage pipes (bedded in pea shingle) to the east of the house
  • More second-fix plumbing, installing the wall-mounted WC in the Master Bedroom En-Suite and fitting some more shower riser bars and spray heads
Week 46, Day 3

Week 46, Day 3

Main run of foul water drainage; Biorock treatment tank in the distance

Main run of foul water drainage; Biorock treatment tank in the distance

Wall-mounted WC in Master Bedroom En-Suite

Wall-mounted WC in Master Bedroom En-Suite