Week 28, Day 4:
- A wetter day, so more work inside than outside
- More work on preparing the second floor for plasterboard
- More first fix of electrical and plumbing
The hot water pipework to basins is 12mm Uponor MLCP with black Armaflex insulation. The aluminium layer in the MLCP sandwich means these pipes tend to stay where they’re bent to – hence the ends tend to be straight rather than curly. The cold water pipework isĀ standard 15mm PEX with grey Climaflex insulation; no aluminium layer.