Week 35, Day 1

Week 35, Day 1:

  • Lots more rain
  • The main event for the day was the installation of the “missing” window on the second floor and the replacement of the two windows originally made with the wrong colour frames
  • More electrical first-fix
  • Installing some of the contoured panels for the LED strip lights recessed into the ceiling
Week 35, Day 1

Week 35, Day 1

Lifting the glass for the Office window up to the second floor

Lifting the glass for the Office window up to the second floor

Office window installed on the second floor

Office window installed on the second floor

"Fylo" lighting channel installed in the ceiling - needs another layer of plasterboard to bring it flush

“Fylo” lighting channel installed in the ceiling – needs another layer of plasterboard to bring it flush

CC BY-SA 4.0 Week 35, Day 1 by Marsh Flatts Farm Self Build Diary is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.