Installation of the vertical, threaded sections of the rise-and-fall gutter brackets then the start of the installation of the roof tiles. The lower section of the tiles at the North end of the Workshop is the only area that needs about a metre of lead flashing, which meant cutting out the horizontal mortar joints ready to seat the lead into.