A final visit by the heating contractor to take some measurements from the Daikin air-to-air heat pump installation, which all seems to be working well – although it’s using more electricity than the Ground Source Heat Pump in the House, despite heating less than half the area to a lower temperature. (This might be a temporary thing because the building is still drying out.)
Half the wall tiles in the Shower Room are now installed – but still need grouting once the second half have been fixed.
Outbuildings: Week 39, Day 4 by Marsh Flatts Farm Self Build Diary is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.