Week 45, Day 1

Week 45, Day 1:

  • A busy day with lots of people on site
  • Tidying up the field which was dug up for the Ground Source Heat Pump collector pipe trenches, now that the soil has had chance to settle
  • Lots of work on the plumbing – sorting out the water and waste for the island sink, piping up the duct heater in the MVHR system, installing another bathroom basin, piping up the remaining shower control boxes etc.
  • More second-fix electrical, mostly more lighting fixtures
  • Applying protective oil to the cedar boards on the solar shading, to match the cedar cladding elsewhere, and then putting a first coat of oil on some of the oak flooring
  • Sanding the rest of the oak flooring ready for oiling
Week 45, Day 1

Week 45, Day 1

Field to west of house levelled out with the weeds scraped off

Field to west of house levelled out with the weeds scraped off

Cedar boards of solar shading treated with Osmo oil

Cedar boards of solar shading treated with Osmo oil

Downlights in Master Bedroom rotated so they shine vertically despite the 30 degree roof pitch

Downlights in Master Bedroom rotated so they shine vertically despite the 30 degree roof pitch

CC BY-SA 4.0 Week 45, Day 1 by Marsh Flatts Farm Self Build Diary is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.