More ‘finishing off’ of the walls up to the level where extra scaffolding is required. The overview photo shows a Roof Truss (temporarily) installed at the North end of the Workshop – mostly to provide a guide as to the transition from Brick to Block on the wall next to it. Later in the day, a truss was installed at the West end of the Utility room (nearest the camera).