Week 57, Day 5

Week 57, Day 5:

  • Installing the armoured cables for the outside lights and sockets
    • To reduce the number of holes through the air tight barrier these exit the house in one location then loop around the outside
  • Installing more of the oak cappings for the glass balustrades around the staircase
Week 57, Day 5

Week 57, Day 5

Armoured cable for outside lights

Armoured cable for outside lights

Oak capping for glass balustrade fixings on first-floor landing

Oak capping for glass balustrade fixings on first-floor landing

Week 57, Day 4

Week 57, Day 4:

  • Finishing off the retaining wall and the structure for the steps up to the front door
  • More work on the oak end-caps for the stair treads and the oak capping over the fixings for the glass balustrades on the landings
Week 57, Day 4

Week 57, Day 4

Structure for steps up to front door

Structure for steps up to front door

Oak capping over glass balustrade fixings on second floor landing

Oak capping over glass balustrade fixings on second floor landing