Week 62, Day 4

Week 62, Day 4:

  • Another air pressure test (number 4, I believe) but not the result the build team were hoping for after the work to fix the leak found in December. It came in at 0.92 Air Changes per Hour which is pretty much double what it needs to be to achieve Passivhaus certification.
  • The site cabins were collected at the end of the day (so still showing in the photo below).
Week 62, Day 4

Week 62, Day 4

Site cabins being collected by Pickerings Plant

Week 59, Day 3

Week 59, Day 3:

  • Mostly working on the main air leak found last week – or at least what is hopefully the main air leak – above the En-Suite to the Master Bedroom, adjacent to the Balcony
Week 59, Day 3

Week 59, Day 3

Remedial air tight taping in the Master Bedroom En-Suite