Week 47, Day 3 Posted on 2016-09-07 by dMb Reply Week 47, Day 3: A bit more tiling – grouting the floor tiles in the ground floor shower room Installing the control boards for the blinds and windows on the second floor, in the Plant Room Week 47, Day 3 Grouted floor tiles in the ground floor Shower Room Control boards in the Plant Room
Week 47, Day 2 Posted on 2016-09-06 by dMb Reply Week 47, Day 2: Lots more work on the second-fix electrical, including the light fittings and drivers in the kitchen and the control panels for the ground floor Further work on the interior woodwork (window sills) and door furniture Week 47, Day 2 BPM AQUILAE recessed LED downlight in kitchen Control panels mostly complete for the Ground Floor