Week 58, Day 1

Week 58, Day 1:

  • Very heavy rain all day, hence the rain spots on the camera lens and the lights on inside at 3pm – and a mini lake on the driveway
  • Good progress with various of the internal snagging items and the installation of the remaining stair end-caps and the last of the oak for the glass balustrades
Week 58, Day 1

Week 58, Day 1

Last section of oak covering the fixings on the glass balustrades

Last section of oak covering the fixings on the glass balustrades

Completed end caps on the ground-to-first floor staircase

Completed end caps on the ground-to-first floor staircase

 

 

Week 57, Day 5

Week 57, Day 5:

  • Installing the armoured cables for the outside lights and sockets
    • To reduce the number of holes through the air tight barrier these exit the house in one location then loop around the outside
  • Installing more of the oak cappings for the glass balustrades around the staircase
Week 57, Day 5

Week 57, Day 5

Armoured cable for outside lights

Armoured cable for outside lights

Oak capping for glass balustrade fixings on first-floor landing

Oak capping for glass balustrade fixings on first-floor landing