Week 35, Day 1

Week 35, Day 1:

  • Lots more rain
  • The main event for the day was the installation of the “missing” window on the second floor and the replacement of the two windows originally made with the wrong colour frames
  • More electrical first-fix
  • Installing some of the contoured panels for the LED strip lights recessed into the ceiling
Week 35, Day 1

Week 35, Day 1

Lifting the glass for the Office window up to the second floor

Lifting the glass for the Office window up to the second floor

Office window installed on the second floor

Office window installed on the second floor

"Fylo" lighting channel installed in the ceiling - needs another layer of plasterboard to bring it flush

“Fylo” lighting channel installed in the ceiling – needs another layer of plasterboard to bring it flush

Week 34, Day 3

Week 34, Day 3:

  • The automatic daily posting hasn’t been working since Tuesday – it turns out that if you turn off the power to the computer that runs the scheduled job to grab the hourly frames from the cameras it stops working. Note to self – take more care to label the power adaptors so I know which one does what.
  • More progress with the ceiling insulation and the ventilation plant
More progress in the Plant Room

More progress in the Plant Room

Ceiling insulation in Bedroom 3

Ceiling insulation in Bedroom 3