Week 32, Day 1

Week 32, Day 1:

  • Some showers at the end of the day, hence the rain-spots on the lens of the time-lapse camera
  • Good progress installing the majority of the ventilation ducts back to the plenum chambers in the Plant Room
  • Some preparatory work by Western Power Distribution for upgrading and re-routing the electricity supply cable from the transformer – they will be installing a larger cable and burying it underground
Week 32, Day 1

Week 32, Day 1

Week 31, Day 2

Week 31, Day 2:

  • More first-fix
  • Routing some of the semi-rigid ventilation ducts for the MVHR system, relatively easy using the plastic ducts and with the Easi-Joists but still something of a challenge in the more congested areas
Week 31, Day 2

Week 31, Day 2

All the ventilation ducts need to pass through the Second Bedroom ceiling

All the ventilation ducts need to pass through the Second Bedroom ceiling

Some of the rooms require twin ducts to carry the required flow rate

Some of the rooms require twin ducts to carry the required flow rate