Week 18, Day 3

Week 18, Day 3:

  • The rain arrived exactly as forecast
  • More good progress with the Structural Insulated Panel installation, despite the weather
  • The two roof windows were delivered
Week 18, Day 3

Week 18, Day 3

Unloading the second panel delivery of the day

Unloading the second panel delivery of the day

Positioning the first panel of the south roof

Positioning the first panel of the south roof

End-of-day view from the main camera location

End-of-day view from the main camera location

The crane, with boom retracted

The crane, with boom retracted

The crane is a Liebherr LTM 1040-2.1.

Week 18, Day 2

Week 18, Day 2:

  • Another cold day and not quite as bright but still no rain (that’s due tomorrow…)
  • Great progress installing the Structural Insulated Panels for the second floor
  • As predicted, the main camera isn’t showing the top of the second floor, but I can only adjust it in fairly big increments and if I move it now it will mess up the time-lapse video, so it’s staying where it is! I’ll make up for that with some extra photos.
Week 18, Day 2

Week 18, Day 2

After about 90 minutes the first few walls are up

After about 90 minutes the first few walls are up

By the end of the day most of the other walls are up as well

By the end of the day most of the other walls are up as well

Close-up view

Close-up view of the south side

North side, showing the curved profile (actually several straight sections)

North side, showing the curved profile (actually several straight sections)

View from behind the main camera

View from behind the main camera