Week 37, Day 3 Posted on 2016-06-29 by dMb Reply Week 37, Day 3: More plastering More electrical and plumbing first-fix, including a lot of work in the Plant Room Forming the dropped-ceiling in the ground floor shower room Week 37, Day 3 DHW tank (left) and GSHP unit (right) installed in the Plant Room Acoustic rubber pad under GSHP Framework for dropped-ceiling in ground floor shower room
Week 37, Day 2 Posted on 2016-06-28 by dMb Reply Week 37, Day 2: More electrical first-fix More plastering Week 37, Day 2 Alcove above wall-hung WC in Master Bedroom En-Suite Plastered wall next to ground-to-first floor staircase