Week 44, Day 2

Week 44, Day 2:

  • Installing the oak into the lids of the floor-boxes in the Living Room
  • Installing some of the internal wooden window boards, which match the wood on the inside of the windows
  • More work on hanging internal doors and installing door furniture
Week 44, Day 2

Week 44, Day 2

Completed floor-box lid, prior to sanding

Completed floor-box lid, prior to sanding

Internal window boards in Living Room

Internal window boards in Living Room

Door to En-Suite in Bedroom 3

Door to En-Suite in Bedroom 3

Week 43, Day 4

Week 43, Day 4:

  • More oak flooring, this time on the first floor landing
  • Installing the furniture for the WC and the washbasin in the Family Bathroom
  • More external window reveals and sills
  • More second-fix electrical
  • More filling, sanding and painting around the recessed down-lights in the Open Plan area
Week 43, Day 4

Week 43, Day 4

Engineered oak flooring on the first floor landing

Engineered oak flooring on the first floor landing

Furniture in Family Bathroom

Furniture in Family Bathroom

Painting around the plaster down-light surrounds in the Open Plan area

Painting around the plaster down-light surrounds in the Open Plan area