Some minor details on the roof tiling in preparation for the ridge tile installation, and more progress with the Electrical first- and second-fix.
The final delivery of roof tiles.

Some minor details on the roof tiling in preparation for the ridge tile installation, and more progress with the Electrical first- and second-fix.
The final delivery of roof tiles.

A Public Holiday in the UK so no attempt at progress by the builders (but I did pull in the first two CAT6 network cables after preparing for their installation with some 50mm x 100mm trunking in the Plant Room).