Week 15, Day 1 Posted on 2016-01-25 by dMb Reply Week 15, Day 1: Work on the second floor structure – wall plates, joist hangers and joists – following the same approach used for the first floor structure Week 15, Day 1
Week 13, Day 2 Posted on 2016-01-12 by dMb Reply Week 13, Day 2: Some limited preparation for installing the timber floor structure for the second floor, although little progress can be made until the detailed design for the transition between the masonry and the SIP construction is agreed. Week 13, Day 2