Outbuildings: Week 4, Day 2

Outbuildings: Week 4, Day 2

More work on the below-DPC walling for the garages, out of shot to the left, together with some more fiddly tasks like installing the in-slab drain pipes and ducts for the incoming electrical supply.

The automated post numbering was showing today as “Week 4, Day 1” (rather than “Day 2”) so I’ve tweaked the starting date to (hopefully) fix that from now on.

Outbuildings: Week 4, Day 1

Outbuildings: Week 4, Day 1

Another good day of progress on the below-DPC walling, much of it out-of-shot to the North (left of the photo).

Today’s post got automatically generated as Week 3, Day 7 – which means there must be a bug in the script logic that derives the post title from the date. I’m going to hope it’s only an occasional issue and fix it manually, noting that today is the 31st of March.