Week 24, Day 6

Week 24, Day 6:

  • A working Saturday, completing the installation of the plywood boxes for the external doors and tidying up the beam-and-block floor in preparation for the insulation and the concrete floor slab
Week 24, Day 6

Week 24, Day 6

Completed plywood box for side door

Completed plywood box for side door

IMG_1755

Completed plywood boxes for lift-and-slide doors

Beam-and-block floor in Living Room

Beam-and-block floor in Living Room

The dark blocks are replacements for ones that had cracked.

Week 24, Day 5

Week 24, Day 5:

  • The second day of window installation, though only really half a day because of waiting for a further delivery (now due on Monday)
  • More preparation of the plywood boxes for the external doors
Week 24, Day 5

Week 24, Day 5

View from main camera location, showing clerestory windows

View from main camera location, showing clerestory windows

One of the Living Room windows, incorrectly supplied in White rather than Dark Grey

One of the “temporary” Living Room windows, incorrectly supplied in White rather than Dark Grey