Week 65, Day 3:
- More work on the front door canopy
- Tidying up some loose ends on the electrics:
- Routing the supplies to the mirror heaters through KNX relays so they can be controlled automatically
- Installing the wiring for the M-Bus meters which can be read automatically – these consist of:
- Heat meters on the central heating and hot water circuits
- Electricity meter on the supply to the heat pump – this meter actually has a pulse output but it’s connected to M-Bus via an adaptor
- Water meters (x3)
- As can be seen from the van in the photo below, the team from Alvaston Glass were back on site measuring up for the first batch of shower enclosures