Week 23, Day 5:
- Good Friday Bank Holiday but the second staircase was ready to be installed and that will help with the window installation next week
With the temporary scaffolding platform removed, for now, it’s possible to get an impression of how the inside of the curved roof will look from the second floor landing. There will be balustrades on the staircase and on the landing but those will be made of glass. Since the “roof” over-sails the first floor wall to the outside there’s actually quite a deep ledge at the top of the masonry wall.