Week 54, Day 4

Week 54, Day 4:

  • Fitting the “secret” door to the electrical cupboard in the kitchen
  • Installing the wooden threshold strips by the sliding doors on the Ground Floor
  • Installing some of the stair tread end caps
  • Installing the outside taps
Week 54, Day 4

Week 54, Day 4

"Secret" door to electrical cabinet in kitchen

“Secret” door to electrical cabinet in kitchen

Oak caps on ends of stair treads

Oak caps on ends of stair treads

Week 54, Day 3

Week 54, Day 3:

  • Quite a busy day with good progress on electrical and plumbing second-fix
  • The most notable progress was with the glass balustrades for the staircases which are about 2/3 installed and should be finished tomorrow
Week 54, Day 3

Week 54, Day 3

Alvaston Glass installing the first section of glass balustrade on the first-to-second floor staircase

Alvaston Glass installing the first section of glass balustrade on the first-to-second floor staircase

Glass balustrade for Second Floor landing

Glass balustrade for Second Floor landing