More work on the below-DPC walling for the garages, out of shot to the left, together with some more fiddly tasks like installing the in-slab drain pipes and ducts for the incoming electrical supply.
The automated post numbering was showing today as “Week 4, Day 1” (rather than “Day 2”) so I’ve tweaked the starting date to (hopefully) fix that from now on.