More of the same as yesterday, finishing up the below-DPC walling on the garages, off to the left of the overview shot.
The large digger and dumper used previously had been collected a few days ago, but a smaller digger and dumper were delivered since there’s a bit more excavation required around the outside of the walls to provide a good base for the scaffolding – and there is a layer of stone to be spread and compacted as a base for the insulation under the floor slabs.