
A lorry-load of bricks was delivered around 08:30 to keep the brick laying on track.
There’s a gable end facing the camera on the right that’s starting to take shape and another facing South (i.e. to the right) at the back-right corner.
A lorry-load of bricks was delivered around 08:30 to keep the brick laying on track.
There’s a gable end facing the camera on the right that’s starting to take shape and another facing South (i.e. to the right) at the back-right corner.