Week 25, Day 2

Week 25, Day 2:

  • The last (planned) day of the window and external door installation
  • The installation team will have to return to fit the glass to the big second-floor window (currently missing-in-action somewhere in Europe) and to replace the two windows that were the wrong colour
Week 25, Day 2

Week 25, Day 2

Internorm HS330 lift-and-slide door to first-floor balcony

Internorm HS330 lift-and-slide door to first-floor balcony

There’s deliberately a step-up to the door threshold since the balcony floor needs insulation and then needs to fall away to the outside to drain any water.

Internorm AT400 front door

Internorm AT400 front door

The red plastic tube is a temporary cover over the full-height stainless steel door handle.

No glass in the top-floor window on the west side

No glass in the top-floor window on the west side

Week 25, Day 1

Week 25, Day 1:

  • You have to look very carefully to see any difference in the main photo, but most of the external windows and doors are now installed.
Week 25, Day 1

Week 25, Day 1

Two of the four Internorm HS330 lift-and-slide doors which arrived before 07:00

Two of the four Internorm HS330 lift-and-slide doors

The other two doors are just visible in the background

One of the HS330 doors installed in the Open Plan Living Area

One of the HS330 doors installed in the Open Plan Living Area

The ground floor insulation and polished concrete slab still needs to be installed (due next week) so the finished floor level will be just below the door threshold.

There’s another matching sliding door to the left of this one, and a smaller one to the right.

The east elevation, with all doors and windows installed

The east elevation, with all doors and windows installed

Temporary installation of PetWalk Passivhaus cat-flap

Temporary installation of PetWalk Passivhaus cat-flap

There’s a cream-coloured cover panel to go over the inside of the cat-flap (and a dark grey one for the outside).