Week 36, Day 4 Posted on 2016-06-23 by dMb Reply Week 36, Day 4: More electrical first-fix More plastering, mostly on the first floor landing (which joins the second floor landing on one side) Week 36, Day 4 Galvanized steel back-box for DRACO plaster wall light, with electrical connection box above DRACO plaster wall light in-situ on first floor landing