Yet another delivery of a full lorry load of concrete blocks first thing in the morning (before 08:00); probably just one more required now
Lots more progress fitting the first floor joists, including the short fiddly ones between the two steel beams over the Living Room
A bit more progress with the blockwork and a lot of preparation for installing the outer walling blocks in the coming days
Feedback to the manufacturers of the SIPS roofing units on their drawings for the roof structure, following the site meeting with the architects last week