Week 10, Day 4:
- More blockwork and steelwork, mostly on the southern elevation
- Because of the long spans over the lift-and-slide door openings, the lintels for the outer cavity walls are Rectangular Hollow Section (RHS) steel rather than concrete as used for the smaller openings
- There’s another steel joist over the open-plan room on the south side, to support the wall between the bedrooms on that side