Week 10, Day 2

Week 10, Day 2:

  • More blockwork, bringing the external cavity walls on the north side up to the level of the first floor structure in preparation for the installation of the floor joists
  • Installing the first of the steel beams over the Living Room
Week 10, Day 2

Week 10, Day 2

I now have a second camera operational, on the basis that: a) I bought another one when it looked like the first one was starting to go wrong (it’s been fine ever since), and b) there will soon be a large house blocking the view from the first camera! The second camera is on the corner of the static caravan nearest the first camera, where there was already a handy pole holding the UniFi Outdoor WiFi Access Point.

Second UniFi Video Camera on corner of static caravan

Second UniFi Video Camera on corner of static caravan, below the UniFi Outdoor WiFi Access Point

The second camera is suffering a bit from facing into the sun for a significant portion of the day, with the sun being so low at this time of year, but that should improve once there’s a house in the way. Here’s the view at the same time as the shot above.

Installing one of the steel beams to support the floor above the Living Room

Installing one of the steel beams to support the floor and walls above the Living Room