Week 58, Day 2

Week 58, Day 2:

  • More tidying up and snagging
  • Preparing for the rubber floor tiles in the Utility Room by installing some ‘No More Ply” to level out the area right by the door
Week 58, Day 2

Week 58, Day 2

'No More Ply' boards to bring the plywood box around the door fame up to the level of the concrete floor in the Utility Room

‘No More Ply’ boards to bring the plywood box around the door fame up to the level of the concrete floor in the Utility Room

Week 58, Day 1

Week 58, Day 1:

  • Very heavy rain all day, hence the rain spots on the camera lens and the lights on inside at 3pm – and a mini lake on the driveway
  • Good progress with various of the internal snagging items and the installation of the remaining stair end-caps and the last of the oak for the glass balustrades
Week 58, Day 1

Week 58, Day 1

Last section of oak covering the fixings on the glass balustrades

Last section of oak covering the fixings on the glass balustrades

Completed end caps on the ground-to-first floor staircase

Completed end caps on the ground-to-first floor staircase