Week 57, Day 4 Posted on 2016-11-17 by dMb Reply Week 57, Day 4: Finishing off the retaining wall and the structure for the steps up to the front door More work on the oak end-caps for the stair treads and the oak capping over the fixings for the glass balustrades on the landings Week 57, Day 4 Structure for steps up to front door Oak capping over glass balustrade fixings on second floor landing