Week 58, Day 2

Week 58, Day 2:

  • More tidying up and snagging
  • Preparing for the rubber floor tiles in the Utility Room by installing some ‘No More Ply” to level out the area right by the door
Week 58, Day 2

Week 58, Day 2

'No More Ply' boards to bring the plywood box around the door fame up to the level of the concrete floor in the Utility Room

‘No More Ply’ boards to bring the plywood box around the door fame up to the level of the concrete floor in the Utility Room