Week 65, Day 5 Posted on 2017-01-27 by dMb Reply Week 65, Day 5: More work on the door canopies, mostly the side door since the front door is nearing completion Installation of the flat panel lights in the ceilings of the door canopies, to illuminate the area outside the doors Week 65, Day 5 Side door canopy with some of the cedar cladding installed Front door canopy with light installed 15W LED flat panel over front door