Week 65, Day 3

Week 65, Day 3:

  • More work on the front door canopy
  • Tidying up some loose ends on the electrics:
    • Routing the supplies to the mirror heaters through KNX relays so they can be controlled automatically
    • Installing the wiring for the M-Bus meters which can be read automatically – these consist of:
      • Heat meters on the central heating and hot water circuits
      • Electricity meter on the supply to the heat pump – this meter actually has a pulse output but it’s connected to M-Bus via an adaptor
      • Water meters (x3)
  • As can be seen from the van in the photo below, the team from Alvaston Glass were back on site measuring up for the first batch of shower enclosures
Week 65, Day 3

Week 65, Day 3

Progress with the “hit and miss” cedar cladding on the front door canopy