Week 62, Day 5:
- Some tidying up of the mains water stop taps, installing access pipes so the surrounding area can be back-filled
- Installing the concrete foundation pads which will support the galvanized steel columns for the canopy over the side door
- There will also be a canopy over the front door but the columns for that will be supported by the retaining wall