Week 62, Day 5

Week 62, Day 5:

  • Some tidying up of the mains water stop taps, installing access pipes so the surrounding area can be back-filled
  • Installing the concrete foundation pads which will support the galvanized steel columns for the canopy over the side door
    • There will also be a canopy over the front door but the columns for that will be supported by the retaining wall
Week 62, Day 5

Week 62, Day 5

Looks different without the site cabins

Concrete pads for the steel columns that will support the canopy over the side door