Week 62, Day 4:
- Another air pressure test (number 4, I believe) but not the result the build team were hoping for after the work to fix the leak found in December. It came in at 0.92 Air Changes per Hour which is pretty much double what it needs to be to achieve Passivhaus certification.
- The site cabins were collected at the end of the day (so still showing in the photo below).