Much better weather so a day of Outdoor work – mostly installing more ridge tiles on the roof (all of the Utility Room and about half of the Workshop) plus some finishing touches to the guttering now some missing components have been delivered.
The groundworks team started preparing to excavate the trench for the incoming electricity supply and loaded a few lorry-loads of muck-away (in preparation for more excavation for the rainwater harvesting tank and the stormwater attenuation pond).
Also the first site visit from the plumbing contractor, who will be starting work shortly.