Week 47, Day 2

Week 47, Day 2:

  • Lots more work on the second-fix electrical, including the light fittings and drivers in the kitchen and the control panels for the ground floor
  • Further work on the interior woodwork (window sills) and door furniture
Week 47, Day 2

Week 47, Day 2

BPM AQUILAE recessed LED downlight in kitchen

BPM AQUILAE recessed LED downlight in kitchen

Control panels mostly complete for the Ground Floor

Control panels mostly complete for the Ground Floor

Week 47, Day 1

Week 47, Day 1:

  • Not much is changing on the outside view at the moment but there’s been a subtle change today- the two rainwater down-pipes have been installed on the south elevation, draining the concealed gutter just below the solar panels – there’s a better view in the wider shot further down
  • More work on the tiling – notably the floor tiles for the wet-room shower in the Ground Floor Shower Room
Week 47, Day 1

Week 47, Day 1

Wider view from the main camera location

Wider view from the main camera location

Floor tiles (not yet grouted) in the Ground Floor Shower Room

Floor tiles (not yet grouted) in the Ground Floor Shower Room